Home Construction Contract Checklist Thailand: Review Before Signing

Home Construction Contract Checklist Thailand: Review Before Signing

30 September 2026

What to check in the contract

  • Scope of work: list inclusions and exclusions in writing, such as earthworks, fencing, landscaping and off-house utilities.
  • Drawings and specifications: attach architectural and engineering drawings and a materials/equipment spec list, with criteria for substitutions.
  • Price and BOQ: attach the bill of quantities (BOQ) so it can be compared with the contract price.
  • Payment stages: should match completed work stages; be cautious of an unusually high first payment.
  • Schedule: start and handover dates, late-delivery penalties and extension conditions.
  • Variations: require an approval and price agreement before work starts.
  • Inspection and warranty: the period and what is and is not covered must be written into the contract.
  • Building permit: confirm who applies to the local authority for the construction permit and who supervises the works.

For Greenery projects: more than 50 homes delivered, over 15 years of experience, and a 5-year main-structure warranty under the contract terms, covering only the items the contract specifies.

This article is general information, not legal or engineering advice. Have your actual contract and conditions reviewed by an appropriate professional.

Sources (checked 30 Sep 2026)

Home Construction Contract Checklist Thailand: Review Before Signing

A contract can look complete while leaving the most expensive questions unanswered. Before signing, connect every important promise to a drawing, specification, price basis, responsible party and written process for changes.

Frequently asked questions

Is the quoted total enough?

No. Check included and excluded work, specifications, provisional items and change procedures.

Who should review technical scope?

Use appropriately qualified professionals where architectural, engineering or legal review is needed.

Does this article replace legal advice?

No. It is a planning checklist; project contracts should be reviewed for their actual facts.