A cost per square metre is only a starting reference; a useful estimate must describe the design, site, specifications and inclusions.
Greenery recommends comparing proposals on the same drawings, specifications and scope. Early figures should be treated as preliminary until site information and coordinated documents are available.
Transport access, soil and fill conditions, drainage, retaining work and local material availability can materially affect Chiang Mai project costs.
An image can clarify style, but a meaningful estimate needs area, site, drawings, systems and specifications.
They may use different scopes, quantities, material grades, allowances, exclusions and risk assumptions.
Explore our house designs, review the construction portfolio, learn about Greenery, or contact our team.
Book a free initial consultation with an architect. Architectural drawings and design services are not included free of charge.
A reliable Chiang Mai home construction cost discussion separates the base building, site-related work, professional services, authority requirements, owner purchases and contingency. DPT’s public-plan catalogue describes its displayed construction prices as preliminary guidance; DPT also states that site plans, soil conditions, foundation selection and current cost calculations must be reviewed for the actual location. A generic price per square metre is therefore a starting reference, not a quotation.
Record how floor area is measured and whether terraces, carports, balconies, double-height spaces, service areas and pool structures are included. Two “square-metre rates” may use different denominators. Compare the underlying area schedule, not just the division result.
Access, demolition, fill, retaining work, drainage, temporary utilities, survey, soil information and utility connections can materially change the project. Add professional design, engineering, permit-related and testing items where applicable. Confirm the local document list instead of assuming every site needs the same items.
Drawings, specifications and quantities should describe the same project. Mark provisional sums and exclusions. Ask how material substitutions, owner changes and unforeseen conditions are approved and priced. The OCPB advises consumers to review the work scope, contractor history and payment conditions before contracting.
Read our quotation comparison guide and construction finance preparation guide, or book an initial free architect consultation. It does not include free drawings or free design.