Understand
Goals, land and daily life
04 CONFIGURATIONS / ONE STANDARD OF TRUST
A design and construction system connecting architecture, wellbeing, energy and a transparent BOQ in one clear language.
EXPLORE SYSTEMS ↘Turning an early ambition into a home whose systems, scope and cost can be reviewed.
Goals, land and daily life
Budget, area and systems
Architecture, engineering and energy
Control quality against drawings and BOQ
A ready home with a clear care plan
Start with your life priorities, then let our architects calibrate the system to your land, scope and actual budget.
A home for every generation
Extended families · Older residents · Universal Design
Safe, fluid spaces prepared for changing needs.
Practical sustainable living
Modern families · Pool villas · Holiday homes
Designed to reduce energy load; actual results depend on use and spec.
Premium healthy living
Doctors · Executives · Expats · Wellness-focused families
Comfortable indoor air, quieter construction and backup energy.
Turnkey & Full BOQ
Business owners · Private clients · Masterpiece residences
Highly tailored design with architect and engineer coordination.
Move the slider to see a starting-price estimate for each system. Final cost depends on the design and the agreed BOQ.
Indicative figures based on starting prices per sq.m. — not a quotation.
Request a project assessment ↗Answer 3 short questions to see a preliminary recommendation. It is a starting point only, not a quotation, and your answers are not stored.
| Access | Standard Eco | Premium Wellness | Bespoke | |
|---|---|---|---|---|
| Starting price | ฿18,000 per sq.m. | ฿19,500 per sq.m. | ฿25,000 per sq.m. | Per BOQ |
| Example, 195 sq.m. | About ฿3.51 million | About ฿3.80 million | About ฿4.88 million | Assessed per design |
| Main structural warranty | 5 years | 5 years | 5 years | 5 years |
| Bored piles | Optional add-on | Optional add-on | Included | As agreed |
Example calculated from the starting price × 195 sq.m. as of Sep 2026, for preliminary budgeting only. It is not a quotation. Actual cost depends on design, specification, location, soil conditions and project timing.
* Prices are preliminary starting frameworks, not final quotations. Actual inclusions and costs depend on design, construction area, specification, location, soil conditions, scope and project timing. Please review the project-specific BOQ and conditions issued by Greenery. Final details follow the quotation and construction contract for each project.
Architects and engineers explain the BOQ by work category—materials, labour, systems, scope and conditions—so important decisions can be reviewed against evidence.
Book a free initial architect consultation 096-551-9996 ↗Clear starting answers before your land, design and project BOQ are analysed in detail.
It is a starting framework for initial planning. The project price depends on the drawings, construction area, location, soil, specification, scope and agreed BOQ.
It brings energy resilience, fresh-air quality and bored piles into one coordinated direction for clients prioritising health, continuity and lower construction disturbance.
Yes, subject to design, site, budget and engineering compatibility. The specification, scope and BOQ are updated for review before approval.
It separates work categories, quantities, materials, labour and scope so costs and variations can be reviewed more clearly.
No. It is an initial discussion of your brief, land, budget and project process. It does not include free drawings, construction documents or architectural design.
The main structural warranty runs for 5 years from handover of the final work phase. It covers foundations, columns, beams, structural slabs and the roof frame where defects arise from Greenery's design or construction. The foundation warranty depends on using the foundation system recommended by the soil investigation and our engineer; if you choose a different system, this is recorded and acknowledged in the contract. Other work, such as architectural finishes, electrical and plumbing systems and water leakage, is warranted for the period stated in your contract. Equipment and appliances follow the manufacturer warranty.
Not covered: extensions or alterations by others, use for a different purpose or lack of maintenance, natural events beyond the design criteria, and normal wear and tear.
Claims must be reported in writing. Final terms are set out in the construction contract for each project.
The bonus offer (for example a built-in kitchen) applies to contracts signed by 31 Dec 2026. The items included, their scope and any combination with other offers are stated in your quotation and contract. Please ask our team for details before you decide.
Greenery follows a Go Green policy: we choose materials, equipment and design approaches that reduce environmental impact and state them in each project's specification and BOQ, for example SCG low-carbon materials, Green Label-certified products and Energy Label No. 5 electrical equipment, as specified per project. Certification labels apply to individual products, not to the whole house. You can request the actual specification for your project from our architects.
GDC / START A PROJECT