  2. Home building cost by floor area and system, checked through a project BOQ

HOME BUILDING COST / 2026

Home building cost by floor area and system, checked through a project BOQ

An initial planning guide for Chiang Mai and Lamphun using published September 2026 starting rates. It is not a quotation and must be tested against the design, specification, soil, site and project BOQ.

What is the starting home construction cost per square metre?

Greenery’s published starting guides are THB 18,000/sq.m. for Access, THB 19,500/sq.m. for Standard Eco and THB 25,000/sq.m. for Premium Wellness. Bespoke work is priced from the project BOQ. A 195 sq.m. example is approximately THB 3.51M, 3.80M or 4.88M before project-specific effects.

BUDGET ESTIMATOR

Change the floor area to see a starting planning range

The result is floor area × published starting guide. It does not include all effects from design, specification, land, external work and contract scope.

195 sq.m.
ACCESS · 18,000/sq.m.
STANDARD ECO · 19,500/sq.m.
PREMIUM WELLNESS · 25,000/sq.m.

Planning use only—not a quotation. Actual inclusions and price follow the drawings, specification, BOQ, quotation and construction contract.

PACKAGE RANGE

Compare starting systems by the outcome you value

Use the package as a starting point, then adapt it to the family, plot, systems and verified budget.

SystemStarting guide195 sq.m. exampleDesigned for
Access · Space & LiftTHB 18,000/sq.m.Approx. THB 3.51MUniversal design, ageing needs and future change
Standard EcoTHB 19,500/sq.m.Approx. THB 3.80MFamilies, holiday homes and energy options within the package scope
Premium WellnessTHB 25,000/sq.m.Approx. THB 4.88MIndoor air, backup energy and premium systems
BespokeProject BOQDesign-specificHighly customised homes and turnkey projects
BOQ & 8-INSTALLMENT MILESTONE GUIDE

Bank-Ready Package BOQ (Up to 100% HBA loan, subject to bank approval) & Sample 8-Installment Schedule

We provide both standard package pricing with bank-ready BOQs for construction loan applications and model-specific itemized BOQs for custom builds, paired with an indicative 8-installment milestone structure.

BOQ 01

Standard Package + Bank-Ready BOQ (Up to 100% HBA loan, subject to bank approval)

An itemised bill of quantities (BOQ), structured for commercial bank appraisal, supporting up to 100% home construction loan financing under Home Builder Association (HBA) member benefits, subject to bank underwriting criteria.

BOQ 02

Custom Build + Model-Specific Itemized BOQ

Separates material quantities and labor costs based on working drawings and site-specific Soil Boring Test engineering, enabling precise budget control and transparent variation management.

8 Stages

10% Signing · 85% Progress · 5% Final Handover

Balanced milestone allocation aligned with actual construction progress and bank disbursement inspections, backed by a contractual 5-year structural warranty.

Installment (Indicative Sample) Share Cumulative Primary Engineering & Construction Milestone
Installment 1 (Contract Signing)10%10%Contract execution / building permit drawings, structural calculations, bank BOQ & site mobilization
Installment 215%25%Site layout / soil-tested piling, footings & ground beam completion
Installment 315%40%Main reinforced concrete (RC) structure (columns, beams & slabs across all floors) complete
Installment 415%55%Smart Truss roof framing / lightweight masonry walls & concealed MEP rough-in conduits
Installment 515%70%Roof tiles with thermal insulation / internal–external plastering & door/window frames
Installment 615%85%Gypsum ceilings / floor & wall tiling & PM2.5 clean-air ventilation ducting per specification
Installment 710%95%Architectural painting / door & window panels, lighting fixtures & complete sanitary ware
Installment 8 (Final Handover)5%100%Final QC inspection / MEP testing, keys handover, As-Built drawings & 5-year structural warranty certificate

* Preliminary guidance note: The 8-installment schedule above is an indicative industry-standard example. Actual milestone terms are defined in each project's signed contract and BOQ.

COST DRIVERS

Why two homes with the same area can have different costs

Form, structure, materials, building systems and site logistics can vary substantially.

01

Form and structure

Large spans, openings, height, storeys, roof geometry and complex details affect material and labour.

02

Materials and systems

Finishes, windows, sanitaryware, cooling, solar, ERV, smart home and joinery must be defined in the specification.

03

Land and external work

Foundations, filling, drainage, walls, gates, landscape, pools, access and logistics may sit outside the starting guide.

FAQ

Questions clients ask before moving forward

Answers are planning guidance. The drawings, BOQ, quotation and signed contract govern the actual project.

How much area could a THB 3.5M budget indicate?

At the THB 18,000/sq.m. starting guide, the arithmetic is about 194 sq.m. before design, specification, land and other project effects. It is only an initial frame.

Does the square-metre figure include the land?

No. It also requires checking external work, foundations, special systems, fees and exclusions in the project BOQ.

Why is a BOQ important?

It separates work sections, quantities, materials, labour and scope, enabling a more useful comparison than a single total.

Can the cost change after design?

Yes, when floor area, form, material, systems or site conditions change. Update the BOQ against approved information and define variation handling in the contract.

RELATED GUIDES

Continue planning with connected information

Move between service, cost, evidence and FAQ pages without losing the project context.

Start with a project assessment, then decide from project-specific evidence

Share the location, working budget, target floor area and preferred start period. The information prepares an initial conversation and is not a quotation or construction contract.

Start project assessment ↗